Return to the point in the document where this table is located.
| Tenant management |
Considerations for Building Management Committee |
Information sources |
Review frequency |
|---|---|---|---|
Faults |
Monitor faults for likely issues that impact on environmental performance. Ensure that fault reports are reviewed, and faults actioned that effect environmental performance. Report lighting faults promptly. Monitor tenant fault report for heating, ventilation and air-conditioning HVAC (e.g. air temperature issues). |
Tenant fault reports Maintenance reports Building owner fault reports |
Quarterly or as required |
Staff levels |
Establish an acceptable range. Monitor staffing levels within the acceptable range. Note: the number of employees has a direct impact on energy use. |
Commencement of lease within first three months As required As required |
|
Fit-out changes |
Consider the impact of fit-out changes on environmental performance. Note any impact on comfort levels as well. Includes partitions. Note the impact on HVAC. Building owner’s approval is required for any hard fit-out changes. |
Refer to fit-out design brief Mechanical engineer report Approve plans by building owner |
As required As required As required |
Equipment |
Consider the impact of equipment numbers (e.g. computers, fridges). Give preference to energy-efficient equipment with energy-saving modes. Liaise with information technology administrator to ensure stand-by function and/or energy saving is enabled. Monitor information technology updates. Consider and review the impact of requests for bar fridges, drinks-vending machines, etc on energy performance. Note: the number of computers and appliances has a direct impact on energy use. |
Liaise with IT administrator |
As required and when purchasing |
Lighting |
Ensure that lighting system controls are functioning as designed. Review operating times. Are out-of-hours operations, including automatic switching overrides and sensor controls, working? |
Check commissioning report Maintenance reports/ staff feedback Maintenance reports Review fault reports |
Commencement of lease/before default period expires Quarterly Quarterly As required |
Controls |
Do not adjust unless labelled as okay to adjust. Submit request to facilities manager. |
||
Non-authorised equipment |
Unauthorised use of radiators, toasters, fans and other non-authorised appliances. |
Inspect regularly Check 30-minute electricity data |
Annually Quarterly |
Vents |
Do not obstruct vents. |
Building inspection reports Maintenance reports |
Annually Quarterly |
Water |
Implement water conservation strategies. |
Water reduction strategies |
Within six months of occupancy |
Workplace travel |
Implement a tenant workplace travel plan. Integrate with other tenants. |
Land Transport New Zealand Workplace Travel Plan Co-ordinator’s Guide |
Within six months of occupancy |
Waste |
Implement waste minimisation strategies. |
Specific waste reduction strategies |
Within six months of occupancy |